What data center developers post as collateral, and what it costs them

What data center developers post as collateral, and what it costs them

Two years ago, a data center developer's conversation with a utility was about capacity and timing. Today it is also about credit. Utilities that agreed to build substations and transmission for a 500 MW campus discovered that some of those campuses never materialized, and the ratepayers were left with the cost. The response, now visible in dozens of large-load tariffs filed across the country, is to treat the data center as a credit counterparty and to secure its obligations accordingly.

For developers, that changes the capital plan. This piece walks through what is being asked for, in what form, and what each form actually costs.

What is being secured

Large-load tariffs typically bundle three things: a long minimum term, a minimum bill, and an exit fee. Terms of ten years are now the floor, with fourteen years in Virginia, fifteen in Minnesota, and twenty years appearing in Florida and Kentucky. Minimum bills usually sit between 80 and 90 percent of contracted capacity, payable whether or not the load shows up. Exit fees recover the utility's unrecovered fixed investment if the customer leaves early.

Collateral exists to make those three commitments real. Roughly 44 of 77 tariffs tracked in one recent industry database included an explicit collateral requirement, and the largest utilities have set the tone. One large investor-owned utility asks for $1.5 million per megawatt of contracted capacity under its large-load tariff, with reductions of up to 70 percent for investment-grade customers or those with an acceptable parent guaranty. Michigan's commission set collateral at half the customer's exit fee, stepping down over the contract term.

Beyond the tariff itself, the same project will usually face interconnection study deposits, contribution-in-aid-of-construction payments for dedicated facilities, and security under any power purchase agreement it signs for supplemental or co-located generation. Each of these is a separate obligation, often to a different counterparty, and each wants its own instrument.

The forms of security, and what they cost

Tariffs generally accept four forms: cash, an irrevocable letter of credit, a parent guaranty, and a surety bond. In practice, the choice comes down to two, because the other two are only available to some developers some of the time.

Cash

Cash is the simplest and the most expensive. A deposit posted to a utility earns little or nothing and cannot be used to build the project. For a developer whose equity is priced in the mid-teens, a $150 million cash deposit for the fourteen-year term of a Virginia agreement is not a $150 million cost; it is $150 million of equity that is not earning its return for fourteen years. Few developers post cash beyond study deposits, and those that do are usually doing so because a bank would not issue the letter of credit.

Parent guaranty

A parent guaranty costs nothing to issue and everything to obtain. Utilities accept them from investment-grade parents, which means the developer needs one, or needs a hyperscale tenant willing to stand behind the developer's obligation. Tenants have become noticeably less willing. A guaranty on a developer's utility obligation is contingent debt on the tenant's balance sheet, and it survives long after the tenant's lease flexibility does.

Letter of credit

The letter of credit is the default. It is a demand instrument: the utility presents a drawing certificate and is paid, without having to prove the default. Utilities like it for that reason. Developers accept it because their banks issue it as part of the project's credit facility.

The costs are three. The first is the fee, typically between 1 and 3 percent per year of the face amount depending on the sponsor's credit and the facility's pricing grid, for the full term of the obligation. The second is capacity: an issued letter of credit reduces the facility's availability dollar for dollar, whether or not it is ever drawn. The third is covenant treatment: undrawn letters of credit are usually counted as debt in leverage tests and borrowing base calculations, so a large collateral requirement can constrain the project's ability to borrow for construction itself. Add these together and the effective cost of a nine-figure letter of credit over a long term is well above the headline fee.

Surety bond

Surety is cheaper than a letter of credit and sits outside the bank facility, which makes it attractive to sponsors. Utilities are more cautious. A traditional surety bond is a conditional instrument: the surety may investigate and assert defenses before paying, which is exactly the delay a utility credit team is trying to avoid. Where tariffs accept surety, they often require bond forms with waived defenses and documentary triggers that make the bond behave like a letter of credit. Getting a surety to write that form, at that size, for a fourteen-year term, is not always possible.

The newer alternative

A fifth form has begun to appear in utility credit discussions: a multi-year insurance policy that the utility accepts as qualifying security in the same way it would accept a letter of credit. The policy responds if the developer fails to pay the secured obligation. It is priced as a premium rather than a fee, does not consume bank capacity, does not require cash collateral to the insurer, and is written for a fixed multi-year term, typically five years, rather than renewed every year.

The instrument is new, but it is no longer untested. A regulated utility has now filed a large-load tariff that names an insurance policy as an accepted form of security, alongside cash and letters of credit. Elsewhere, acceptance is still negotiated counterparty by counterparty, and the policy form has to align with the tariff's definition of acceptable security. For developers whose letter of credit capacity is the binding constraint on their next campus, it is worth understanding before the next tariff conversation begins.

What to do before you sign

Read the security section of the tariff before the capacity section. Ask what forms of security are acceptable and whether the utility has accepted alternatives. Model the letter of credit's cost at its full term, not its first-year fee, and include its effect on the facility's availability and covenants. And bring the security question to the capital partners early, because a collateral requirement that is a footnote in the utility agreement is a headline in the credit agreement.

Strata Specialty structures credit support and collateral insurance for data center developers and the funds that back them. To discuss a specific requirement, see Strata Digital Infrastructure or contact info@strataspecialty.com.

Strata Specialty insurance products are provided by FRG Specialty Insurance Services LLC, a Managing General Agency licensed to sell property-casualty insurance products (NPN 21008376). The Site is not intended as a solicitation for insurance in any state, territory, or province where FRG Specialty Insurance Services LLC is not licensed. The information provided on this website does not constitute insurance advice. All content and materials are for general informational purposes only and summarized coverage descriptions do not contain relevant policy conditions, exclusions, or limitations. Products and discounts not available to all persons in all states and are subject to underwriting guidelines, review, and approval.

© 2026 FRG Specialty Insurance Services LLC. All rights reserved.

Strata Specialty insurance products are provided by FRG Specialty Insurance Services LLC, a Managing General Agency licensed to sell property-casualty insurance products (NPN 21008376). The Site is not intended as a solicitation for insurance in any state, territory, or province where FRG Specialty Insurance Services LLC is not licensed. The information provided on this website does not constitute insurance advice. All content and materials are for general informational purposes only and summarized coverage descriptions do not contain relevant policy conditions, exclusions, or limitations. Products and discounts not available to all persons in all states and are subject to underwriting guidelines, review, and approval.

© 2026 FRG Specialty Insurance Services LLC. All rights reserved.

Strata Specialty insurance products are provided by FRG Specialty Insurance Services LLC, a Managing General Agency licensed to sell property-casualty insurance products (NPN 21008376). The Site is not intended as a solicitation for insurance in any state, territory, or province where FRG Specialty Insurance Services LLC is not licensed. The information provided on this website does not constitute insurance advice. All content and materials are for general informational purposes only and summarized coverage descriptions do not contain relevant policy conditions, exclusions, or limitations. Products and discounts not available to all persons in all states and are subject to underwriting guidelines, review, and approval.

© 2026 FRG Specialty Insurance Services LLC. All rights reserved.